How Many Hours Can a Gasification Plant Operate Annually?
Annual hours depend on plant design, maintenance, fuel supply and equipment availability. For WARP gasification projects, Univastum uses 8,000 operating hours per year, approximately 91% of the 8,760-hour calendar year, as a planning basis rather than a performance guarantee.
At a nominal 5.0 t/h of prepared fuel, this corresponds to approximately 40,000 t/year. Actual throughput and energy output depend on achieved operating hours, load and fuel availability.