Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Cooling for Industrial Chilled Water

Modular Industrial Cooling from Waste Based on WARP Gasification Technology
The modular Waste-to-Cooling system converts qualified waste-derived and biomass feedstocks into conditioned syngas, which is used to produce industrial cooling through absorption cooling technology.

A standard project configuration combines fuel preparation, one or more WARP gasification modules and a dedicated cooling system comprising one or more appropriately configured direct-fired absorption chillers.
Waste preparation → WARP gasification → Conditioned syngas → Direct-fired absorption chiller → Chilled water

One standard WARP module provides the following indicative operating figures:

How Waste-to-Cooling Works

The Waste-to-Cooling process comprises three main stages.

  1. Waste Preparation

The preparation system is configured according to the type and characteristics of the incoming feedstock.
For unsorted MSW, the system includes sorting, removal of inert materials, shredding, drying and homogenisation to produce fuel meeting WARP specifications.
Prepared RDF, SRF, biomass and other qualified fuels may require only project-specific conditioning.

2. WARP Gasification

Prepared feedstock is converted into syngas using WARP gasification technology.
The syngas is cooled and prepared within the WARP process before being supplied to the cooling system.
The conditioned syngas serves as the primary fuel for the direct-fired absorption chillers.

3. Absorption Cooling

Conditioned syngas is supplied to a specially configured burner in a direct-fired absorption chiller.
The reference configuration considered for preliminary design uses a double-effect absorption cycle to convert the thermal energy released by syngas combustion into industrial cooling.
The absorption system produces chilled water or another suitable cooling medium for industrial applications.
The absorption system requires a dedicated heat-rejection system, typically incorporating cooling water and cooling towers or equivalent equipment, designed according to local climatic and site conditions.
The burner, gas train and absorption-chiller configuration must be compatible with the actual syngas composition, heating value, pressure and flow. Final equipment selection requires confirmation of technical compatibility by the equipment supplier.

Standard Waste-to-Steam Configuration

The following parameters describe a representative Waste-to-Cooling configuration based on one standard WARP module.

Indicative Parameters per Module

* For MSW projects, approximately 40,000 tonnes per year of prepared feedstock corresponds to an illustrative 80,000 tonnes per year of incoming MSW, assuming a 50% prepared-fuel yield. The actual ratio depends on waste composition, moisture content and preparation requirements.
The cooling figures represent preliminary gross absorption-chiller output estimates rather than guaranteed cooling delivery at the customer battery limit.

The indicative cooling conversion factor of 1.0 MWc/MWth is used solely for preliminary project screening. It is applied to the LHV energy of conditioned syngas available at the absorption-chiller burner inlet and is not a guaranteed absorption-chiller COP. Final performance is subject to confirmation based on the selected absorption-chiller configuration, actual syngas characteristics and heat-rejection conditions.

Actual performance depends on fuel characteristics, syngas compatibility, selected equipment, heat-rejection conditions and the project-specific energy balance.

Modular Scaling

Waste-to-Cooling capacity can be scaled by combining multiple standard WARP modules.

For preliminary screening, the following prepared-fuel characteristics are considered:
  • Prepared MSW-derived fuel: approximately 12–18 MJ/kg LHV
  • RDF/SRF: approximately 14–22 MJ/kg LHV
The cooling-output calculations are based on approximately 5 t/h of prepared fuel per module and an indicative conversion factor of 1.0 MWc per MWth of conditioned-syngas LHV energy available at the absorption-chiller burner inlet.

Indicative Cooling Capacity by Number of Modules

* Incoming MSW figures are illustrative and assume a 50% prepared-fuel yield. They apply only to projects with on-site MSW preparation; where prepared RDF/SRF is supplied directly, incoming MSW figures are not applicable.
The cooling-capacity values are indicative estimates for preliminary project screening. Final output is established through the project-specific energy balance, absorption-chiller selection and equipment-supplier confirmation.

Cooling Media and Temperatures

For most industrial and central air-conditioning applications, the standard cooling product is chilled water.

A typical preliminary design basis is:
7°C supply / 12°C return

Other cooling temperatures can be considered according to the requirements of the receiving industrial process. Depending on the application, the cooling system may use chilled water, water-glycol mixtures or other suitable secondary cooling media. Lower-temperature and sub-zero cooling applications require a separate technical assessment and an appropriately selected cooling technology.

Modular Cooling Configuration

Multiple WARP modules can supply a common absorption-cooling plant or several absorption chillers operating in parallel.

The configuration is determined by cooling demand, prepared-fuel availability, required cooling temperatures, heat-rejection conditions, redundancy and planned project development phases. The number of absorption chillers is selected independently of the number of WARP modules.

Cooling as Part of an Integrated Energy System

Cooling can also be produced as an additional energy output when WARP syngas is primarily used for electricity or industrial steam generation.

Where suitable recoverable thermal energy is available, steam or hot water can be used to drive an absorption chiller.
WARP gasification → Syngas → Power/steam generation → Recoverable heat → Absorption chiller→ Chilled water
The available cooling capacity depends on the quantity and temperature of recoverable heat. Its integration and any impact on electricity or steam output are assessed through the project-specific energy balance. This cooling output is calculated separately from the direct-fired Waste-to-Cooling configuration.

Industrial Cooling Applications

Waste-to-Cooling is intended primarily for industrial facilities and infrastructure with stable and predictable cooling demand.

Typical applications include:

  • Food and beverage processing
  • Chemical and pharmaceutical manufacturing
  • Industrial process cooling
  • Manufacturing chilled-water systems
  • Central air-conditioning plants
  • Data centres
  • District cooling systems
Cooling temperature, cooling medium, operating conditions and delivery requirements are defined according to the receiving facility.

For applications requiring high availability, such as data centres and district cooling systems, backup capacity and redundancy are addressed during project design.

Project Delivery Models

Univastum Waste-to-Cooling projects can be delivered through equipment supply, integrated turnkey solutions or long-term Energy-as-a-Service arrangements.

For suitable larger projects, Build–Own–Operate (BOO) and Build–Own–Operate–Transfer (BOOT) structures may also be considered.

A preliminary project assessment can begin with the available waste or prepared-fuel volume, required cooling capacity, cooling-medium temperatures, cooling-water availability and basic site conditions.