Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Textile Manufacturing

Process Steam and Electricity from Textile Waste, MSW, RDF, SRF, Biomass and Other Suitable Fuels
Waste-to-energy systems for textile manufacturing convert suitable non-recyclable combustible waste into process steam and electricity for use within the plant.

Univastum develops and implements such systems based on its proprietary WARP gasification technology. These energy systems can be configured for process steam production, electricity generation, or combined heat and power (CHP), depending on the plant’s energy demand, available fuels, fuel characteristics and existing infrastructure.

Cooperation models include project development, supply and integration of the energy system, as well as Energy-as-a-Service — the contractual supply of steam and/or electricity.

Potential Benefits for Textile Plants

Energy supply from waste
Production of steam and electricity from on-site and externally sourced waste, reducing the need for purchased fuels and dependence on individual suppliers
Energy cost control
Improved predictability of steam and electricity costs through on-site energy generation and long-term fuel or energy supply arrangements
Reduced environmental impact
Potential reduction of greenhouse gas emissions, with project-specific results that can support ESG reporting and product carbon footprint calculations

Potential Reduction in Fossil-fuel Use and CO₂ Emissions

Replacing part of the natural gas, coal or fuel oil used for steam and electricity generation can reduce fossil-fuel consumption and associated fossil CO₂ emissions.

The actual greenhouse gas impact depends on the existing energy system, fuel composition, transport requirements, auxiliary energy consumption, plant utilization and the selected system configuration. These factors are assessed on a project-specific basis.

Steam Production from Waste for Textile Manufacturing

For textile facilities with a stable thermal load, a WARP-based system can be configured primarily for process steam production.

Prepared fuel is converted into syngas, which is then used to generate heat and produce steam in a boiler system. Depending on the process configuration, additional process heat may be used for boiler feedwater preheating, hot-water production or fuel drying. Steam pressure, temperature and output are defined by the requirements of the textile production process.

Electricity and Combined Heat and Power for Textile Plants

The system may include on-site electricity generation for production equipment, pumps, compressors, ventilation, water-treatment systems and other plant consumers.

Where appropriate, the system can be configured for combined heat and power (CHP), producing electricity together with process steam or hot water. The output ratio is determined by the plant’s requirements, consumption profile and the thermal balance of the selected system.
This configuration can reduce dependence on purchased electricity and fossil fuels while matching energy output to the actual steam and power demand of the textile plant.

Textile Waste and External Fuel Sources

The system can use prepared waste generated by the textile plant, externally sourced fuels, or a combination of both. This allows the energy system to maintain a sufficient fuel supply even where the volume of on-site production waste is insufficient.

Non-recyclable combustible textile production waste can be considered for energy recovery, including offcuts, fibre and yarn residues, and rejected materials. Refuse-derived fuel (RDF), solid recovered fuel (SRF), suitable industrial waste and biomass, including wood and agricultural residues, may also be used.

Materials Suitable for Recycling should be Directed to Appropriate Material-recycling Routes

Acceptable fuel types and blend composition are determined on the basis of feedstock characteristics, preparation requirements and environmental constraints. Fuel cost, supply stability, transportation and storage are also considered during project development.

Integration into Existing Textile Production

A waste-to-energy solution for a textile plant is integrated into the plant’s existing steam distribution and electrical infrastructure. A modular configuration allows capacity to be increased in stages. Depending on available fuel, consumption profile and energy supply reliability requirements, the system can cover part or all of the plant’s demand for process steam and/or electricity.

The design takes into account operation alongside existing equipment, peak loads and required redundancy. Installation and connection are coordinated with the production schedule to minimise disruption to plant operations.

Where Steam is Used in Textile Manufacturing

Steam is a major thermal utility in textile manufacturing, particularly in wet-processing operations such as desizing, scouring, bleaching, dyeing, washing, printing, finishing and drying. It is also widely used to produce process hot water.

The main applications include:
  • Desizing, scouring and bleaching
    Heating water and process solutions used for preparation and cleaning of textile materials
  • Dyeing and washing
    heating process media and maintaining specified operating temperatures
  • Printing and dye fixation
    Steam treatment used for dye fixation in applicable production processes
  • Drying and finishing
    Heat supply through steam-heated cylinders, heat exchangers and other steam-heated equipment
  • Hot water and auxiliary services
    Heating process water, tank heating and equipment cleaning

Cooperation Models

Supply and Integration of the Energy System

Under this model, the textile manufacturer owns the energy system. Univastum performs the agreed scope of engineering work, supplies the equipment and integrates it into the plant infrastructure.

Energy-as-a-Service

Under the Energy-as-a-Service model, the plant enters into a long-term agreement for the purchase of process steam and/or electricity. Univastum provides the supply, installation, operation and maintenance of the energy equipment. Energy supply parameters, pricing and payment terms are defined contractually.

How a Project Starts

A preliminary project assessment requires information in five areas:
  • Steam: pressure, temperature, average and peak demand, consumption profile.
  • Electricity: consumption, maximum load and tariffs.
  • Existing energy supply: boilers, fuels used, consumption and cost.
  • Available waste: types, quantities, composition and potential external supply sources.
  • Site: location, available space and connection points to the plant’s steam, electrical and other utility systems.
Based on the information received, Univastum assesses the applicability of the solution and defines the scope of further engineering work, including a preliminary configuration, mass and energy balance, and economic assessment.

Preliminary Technical and Economic Assessment

The available data are used to develop an initial system configuration, mass and energy balance, and preliminary economic assessment.

The initial information does not need to be complete. Additional data requirements can be identified as the project assessment progresses.