Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Electricity with WARP Gasification

Modular Electricity Generation from Waste Based on WARP Gasification Technology
The modular Waste-to-Electricity system converts qualified waste-derived and biomass feedstocks into electricity using WARP gasification technology.

A standard project configuration combines one or more WARP gasification modules with fuel preparation, syngas utilisation and a steam-turbine power island.
Incoming waste/feedstock → Preparation → WARP gasification → Syngas → Steam boiler → Steam turbine → Electricity
For preliminary project screening, Univastum Waste-to-Electricity solution with one
standard WARP gasification module can be considered on the basis of approximately:
  • 5 tonnes
    of prepared feedstock per hour as an indicative
  • 5.5–8 MWe
    net electrical output
  • 8,000 hours
    of operational runtime per year
  • 44–64 GWh
    of net electricity generated per year from a single module
Multiple WARP gasification modules can be combined within one project, allowing generation capacity
to scale with available feedstock, required electrical output and project development phases.

How Waste-to-Electricity Works

The Waste-to-Electricity process comprises three main stages.

  1. Waste Preparation

The preparation system is configured according to the type and characteristics of the incoming feedstock. The system can process unsorted high-moisture MSW, as well as prepared RDF/SRF, industrial waste, biomass, plastics, rubber and blends of different waste-derived fuels.

For unsorted MSW, the system includes a complete preparation process comprising sorting, removal of inert materials, shredding, drying and homogenisation. Prepared RDF/SRF and other fuels can be further conditioned where required to meet the specified feedstock parameters.

2. WARP Gasification

Prepared feedstock is converted into syngas using WARP gasification technology. The syngas acts as an intermediate energy carrier between the prepared feedstock and the downstream power-generation system.

3. Electricity Generation

The energy contained in the syngas is converted into steam and electricity through the project power island. A typical configuration uses syngas in a dedicated boiler to generate steam for a steam turbine and electrical generator.

Standard WARP Waste-to-Electricity Module

WARP gasification solutions are based on a standard modular architecture. For Waste-to-Electricity projects, the number of gasification modules and the configuration of the power island are determined by available feedstock, fuel characteristics, required electrical output and project development strategy.

Indicative Parameters per Module

* For MSW projects, approximately 40,000 tonnes per year of prepared feedstock may require up to ~80,000 tonnes per year of incoming MSW before preparation. The actual ratio depends on waste composition, moisture content and the required feedstock specification.
Actual performance depends on prepared feedstock characteristics and the specific project configuration.

Modular Scaling

Waste-to-Electricity plant capacity can be scaled by combining multiple standard WARP modules.
* Incoming MSW and prepared feedstock represent the same waste stream before and after preparation and should not be added together. Actual incoming MSW volumes depend on waste composition, moisture content and the required feedstock specification.

** Based on approximately 8,000 operating hours per year.
The power configuration can use either one common steam-turbine power island serving multiple WARP modules or multiple independent power islands.

The choice between a common power island and multiple independent power islands is determined by the number of WARP modules, phased commissioning requirements, safety, redundancy and operational reliability.
This architecture enables phased capacity deployment, the use of independent power islands and future plant expansion through the addition of WARP modules and corresponding power-generation equipment.

Combined Heat and Power Options (CHP)

The primary energy product of the Waste-to-Electricity configuration is electricity.

Where a stable steam or heat off-taker is available, the power system can also be configured for combined production of electricity and useful thermal energy.

The optimum balance between electrical and thermal output is project-specific and depends on steam conditions, thermal demand and the selected turbine configuration.

Project Delivery Models

Univastum Waste-to-Electricity projects can be developed through equipment supply, integrated turnkey delivery and Energy-as-a-Service models.

For suitable larger infrastructure projects, Build–Own–Operate (BOO) and Build–Own–Operate–Transfer (BOOT) structures can also be considered.

A preliminary assessment can start from the available waste or fuel volume, required electrical capacity and basic site conditions.