Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Investing in Waste-to-Energy

Developing investable Waste-to-Energy infrastructure
Waste is not only an environmental challenge. It is an energy resource and the foundation for long-term infrastructure investment.

Univastum develops modular Waste-to-Energy projects based on its proprietary WARP gasification technology — from engineering and project structuring through financing and construction to long-term operation.

The Real scarcity is well-structured projects

There is no shortage of waste. Energy demand continues to grow, and capital continues to seek quality infrastructure opportunities. What is scarce are projects that bring these elements together in the right structure.

A Waste-to-Energy opportunity becomes an investable project when feedstock, offtake, contracts, risk allocation and financing are integrated into a coherent, financeable project structure.

The investment logic of Waste-to-Energy

A Waste-to-Energy project starts not with technology, but with economics: secured feedstock, contracted revenues, disciplined CAPEX, controlled OPEX and properly allocated risks.

Secured waste supply
The foundation of a project is a secured waste supply with defined volumes, known characteristics and a long-term contractual framework. The facility configuration and capacity are designed around the actual feedstock available to the project.

Contracted revenues
The principal revenue streams are:
  • Tipping fees / gate fees for waste acceptance and processing.
  • Electricity sales.
  • Steam and heat sales.
Recovered recyclables, other saleable products and, where applicable, carbon credits provide additional revenue streams.

Contractual foundation
Waste supply and acceptance terms, tipping fees / gate fees, concession obligations and energy offtake are defined within the project’s long-term contractual framework.
This structure provides the basis for forecasting project cash flows and determining debt capacity.

Modular scaling
Project capacity is built around standardized WARP modules, matched to secured waste volumes and energy offtake opportunities.
The modular architecture allows capacity to be configured around actual feedstock volumes and, where required, expanded as available waste volumes and energy demand grow.

From technology to investable infrastructure

Univastum goes beyond supplying WARP. We develop Waste-to-Energy projects as infrastructure assets — from engineering and commercial modelling to project structuring, commissioning and long-term O&M/LTSA.

Our objective is to turn a technical concept into a financeable infrastructure project and take it from development through construction to long-term operation.

Investing at project level

Investment is structured around a specific Waste-to-Energy project with its own contractual framework, economics and cash flows. WARP provides the technological foundation, while the investment case is built around the infrastructure asset itself.

Each project is structured with its own capital and financing mix, which may include equity, commercial debt, ECA support and other available financing instruments, typically through a dedicated SPV. Univastum may also invest in selected projects alongside local developers, strategic partners and financial investors.

Different Markets. Consistent investment principles.

The availability of waste alone does not make a project investable. We develop projects where the critical elements come together: secured feedstock, credible offtake, viable economics, an executable contractual structure and access to financing.

If these elements do not align, the project does not move to the next stage of development.

Partner with Univastum

We are interested in projects that can be taken through construction and into long-term operation. We work with developers, strategic partners and financial investors who bring something concrete to a project — secured feedstock, offtake, a project site, local infrastructure, capital or market access.