Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Alternative Fuel Gasification
for the Cement Industry

Waste-to-Energy Solutions Converting RDF, SRF, Industrial Waste and Biomass into Syngas for Fossil Fuel Substitution and on-site Energy Generation
Univastum delivers waste-to-energy and alternative fuel gasification solutions for the cement industry based on its proprietary WARP gasification technology.

WARP converts prepared RDF/SRF, municipal and industrial waste, biomass, mixed plastics, end-of-life tyres (ELT) and suitable fuel blends into combustible syngas for use as an alternative energy source in cement production.

The resulting waste-derived syngas can be used directly at cement plants to partially replace natural gas, coal and petcoke in calciners, selected rotary kiln burner configurations and Hot Gas Generators (HGG).

Unlike the direct feeding of solid alternative fuels, gasification first converts prepared feedstock into a gaseous fuel. This creates a separate process stage between waste handling and the cement process, allowing energy to be supplied as a controlled flow of syngas.

Depending on the plant’s energy profile, WARP gasification downstream can also be configured for on-
site electricity generation, heat recovery and the drying of raw materials or fuels.

The system can be integrated into existing cement plant infrastructure and configured around the kiln line, available feedstock, fuel balance and required level of thermal substitution.

Projects can be implemented through equipment supply and integration or under an Energy-as-a-Service model with long-term supply of syngas, thermal energy and/or electricity to the cement plant.

Waste-to-Energy and WARP Applications in Cement Production

WARP converts locally available RDF/SRF, industrial waste, prepared municipal waste, biomass and other suitable alternative fuels into syngas that can be used for clinker production, drying processes and, where appropriate, electricity generation and heat recovery.

The specific WARP configuration is determined by feedstock characteristics, the existing plant process configuration and the selected point of integration.
Key applications include:
Calciner and kiln system
syngas can be co-fired with conventional fuels to provide partial thermal substitution

Hot Gas Generators (HGG)
syngas can be used to generate hot gas for drying raw materials, fuels and mineral additives

Blended feedstocks
different types of prepared waste, RDF/SRF, biomass and other suitable feedstocks can be used individually or as part of controlled fuel blends.
Electricity generation and heat recovery
additional energy configurations can be incorporated depending on the plant’s energy profile.

Fuel diversification
locally available waste and alternative fuels can complement conventional fuel supply.

Alternative Fuels and Thermal Substitution of Fossil Fuels

WARP syngas can be used alongside conventional fuels in suitable thermal processes within a cement plant.

For preliminary project assessment, a 30% thermal substitution rate can be used as a reference scenario. This does not represent a technical limit of the system. The achievable substitution rate is determined for each kiln line and point of integration.

It depends on burner design, syngas composition and calorific value, required gas flow and pressure, combustion stability, the existing fuel balance and the process requirements for stable clinker production.

For energy-equivalence calculations, natural gas can be used as a reference fuel. Assuming a lower heating value of approximately 35.8 MJ/Nm³ for natural gas and an indicative Cold Gas Efficiency (CGE) of 0.75, the approximate quantity of prepared feedstock required to produce syngas with an energy content equivalent to 1 Nm³ of natural gas is:
These values are indicative. Actual feedstock consumption is determined by its composition,
calorific value and moisture content, together with the material and energy balance of the specific project.

Waste-Derived Syngas for Hot Gas Generators and Drying

HGG systems are used to produce hot gas for drying:
  • raw materials and raw meal
  • coal and petcoke
  • RDF/SRF and other alternative fuels
  • mineral additives
  • other wet process materials
A typical energy chain is:
RDF / waste / biomass → WARP gasification → Syngas → HGG → Hot gas for drying
This configuration enables gasification to be integrated with an existing drying system without
directly introducing alternative solid fuel into the clinker production process.

Syngas for the Calciner and Kiln System

WARP converts prepared alternative fuels and waste feedstocks into syngas before the energy is introduced into the clinker production process. Following the required gas conditioning, syngas can be supplied to the calciner or co-fired with conventional fuels in other suitable thermal applications.

Instead of directly feeding heterogeneous solid fuel, energy is supplied to the cement process as a controlled gaseous fuel stream.

Potential applications include:
  • partial thermal substitution in the calciner
  • co-firing with conventional fuels
  • selected main rotary kiln burner configurations
  • Hot Gas Generators
The achievable thermal substitution rate is determined for each configuration based on the kiln
and burner systems, syngas characteristics and the requirements for stable clinker production.

Gasification or Direct RDF Co-Processing?

Direct RDF co-processing is an established and widely used method of replacing conventional fuels where RDF of the required quality and the necessary preparation, storage and feeding infrastructure are available.

Gasification is not intended to replace direct co-processing in every application.

It provides an additional technological option for fuel streams whose direct use may be constrained by heterogeneous composition, particle size, feeding characteristics or the requirements of a particular kiln system.
  • Direct RDF Co-Processing
    • RDF is fed directly into the kiln system
    • RDF particle size and homogeneity affect feeding and combustion
    • Changes in RDF characteristics directly affect feeding and combustion
    • Most of the mineral fraction of RDF enters the kiln system
    • A solid-fuel feeding system is required
    • RDF characteristics must meet the requirements of the specific injection point
  • WARP Gasification
    • Prepared fuel is first converted into syngas
    • The direct influence of solid-fuel particle size and physical characteristics on burner operation is reduced
    • Gasification provides an intermediate conversion stage between the feedstock and the cement process
    • Part of the mineral fraction can be separated with the ash before syngas is supplied
    • Energy is supplied as a controlled gaseous fuel stream
    • A broader range of prepared fuel blends can potentially be considered
The choice between direct RDF co-processing and RDF gasification depends on the characteristics of the available fuel, the existing kiln system, plant infrastructure and the required level of thermal substitution.

In some projects, a combined configuration may be appropriate: RDF meeting the required specifications is used directly in the cement process, while other prepared combustible waste streams are directed to gasification.

RDF, Waste and Biomass Feedstocks for Gasification

WARP gasification solution can operate with different types of prepared combustible waste,
alternative fuels and suitable fuel blends.

Potential feedstocks include:
  • RDF and SRF
  • prepared municipal solid waste (MSW)
  • combustible industrial waste
  • mixed plastic waste not directed to material recycling
  • end-of-life tyres (ELT) and rubber waste
  • woody biomass
  • agricultural residues
  • other suitable combustible materials
Fuel blending can be used to manage calorific value, moisture content and other feedstock characteristics, accommodate the availability of different waste streams and reduce dependence on a single fuel source.

Feedstock qualification considers lower heating value (LHV), moisture content, ash content, chlorine, sulphur, metals and other components that may affect the gasification process and subsequent use of the syngas.

Materials suitable for material recycling are considered in accordance with the applicable waste hierarchy before being used for energy recovery.

Ash Separation and Management of Fuel-Derived Components

With gasification, the mineral fraction of the fuel is not introduced directly into the cement process together with the solid alternative fuel.

Ash generated during gasification is removed from the system before the syngas is supplied to the end user. As a result, part of the mineral fraction of the original feedstock can remain outside the kiln system.

The distribution of chlorine, sulphur, alkali compounds and trace metals between ash, entrained solids and the gas phase depends on feedstock composition, gasification temperature and the subsequent gas-conditioning configuration.

These parameters are considered during feedstock qualification and development of the process configuration. Where required, the system can incorporate syngas cooling and cleaning to remove particulates and control selected volatile components before the gas is used in an HGG, calciner or kiln system.

Electricity Generation and Heat Recovery

The primary WARP application in the cement industry is the use of syngas to supply thermal processes and replace part of the conventional fuel demand.

Where appropriate for the plant’s energy profile, the system can also be configured for on-site electricity generation and heat recovery. Generated electricity can be used for the cement plant’s own consumption, including mills, fans, compressors, pumps, conveyors and other auxiliary equipment. Available process heat can be recovered for drying raw materials and fuels, preheating air or water, and other thermal requirements.

The balance between direct syngas use, electricity generation and heat recovery is determined by the energy profile of the individual plant.

Cement Decarbonisation and Potential CO₂ Emissions Reduction

Alternative fuel gasification can contribute to cement decarbonisation by replacing part of the fossil fuel used for thermal energy with waste-derived syngas.

The impact of replacing conventional fuels with syngas on direct fossil CO₂ emissions depends on the fuel being replaced, feedstock composition and the relative fossil and biogenic energy fractions of the feedstock.

For an illustrative cement plant with specific heat consumption of 3.4 GJ/t of clinker, a clinker-to-cement ratio of 0.76 and a 30% thermal substitution rate, the amount of conventional fuel energy replaced by syngas is approximately:

3.4 GJ/t clinker × 0.76 × 30% ≈ 0.78 GJ/t cement

The actual change in direct emissions depends on the composition of the alternative fuel, its biogenic fraction, the efficiency of conversion into syngas and the applicable emissions-accounting methodology.

For an illustrative scenario assuming a 40% biogenic energy fraction in MSW-derived fuel and a CGE of 0.75, the indicative impact is:

Technical Note

For indicative calculations, emission factors from the 2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2.
Energy are used:
  • natural gas — 56.1 kg CO₂/GJ;
  • other bituminous coal — 94.6 kg CO₂/GJ;
  • petroleum coke — 97.5 kg CO₂/GJ;
  • non-biomass fraction of municipal waste — 91.7 kg CO₂/GJ.

Under the stated assumptions, replacing coal or petcoke with MSW-derived syngas can reduce direct fossil CO₂ emissions.
A similar reduction relative to natural gas cannot be assumed automatically and must be determined based on the actual feedstock composition and applicable accounting methodology.

The figures are intended for preliminary comparison only. Project-specific calculations are based on actual feedstock composition, biogenic fraction and the material and energy balance of the installation.

Effects associated with avoided landfill disposal, methane emissions, transportation and other lifecycle factors are assessed separately from direct emissions at the cement plant.

CBAM and Cement Carbon Intensity

The EU Carbon Border Adjustment Mechanism (CBAM) entered its definitive regime on 1 January 2026, with cement among the covered sectors. For cement within the CBAM scope, embedded-emissions accounting addresses direct production emissions and applicable indirect emissions associated with electricity consumption.

Using syngas to replace part of the conventional fuel mix can affect the fuel-related component of direct embedded emissions. In configurations incorporating on-site electricity generation or changes in purchased electricity consumption, the indirect emissions balance may also be affected.

Gasification does not eliminate process CO₂ emissions arising from limestone calcination.

Its effect on the carbon intensity of cement therefore relates primarily to fuel-related emissions and, where applicable, electricity-related indirect emissions rather than the process emissions inherent to clinker production.
For individual CBAM-relevant projects, the assessment is based on the actual fuel and electricity balance, feedstock composition and biogenic fraction, and the applicable EU CBAM methodology.

Integration into an Existing Cement Plant

The modular architecture of WARP gasification solution allows the system to be configured
around the required thermal capacity and the plant’s existing infrastructure.

Potential integration points include:
  • calciner
  • selected main kiln burner configurations
  • gas and dual-fuel burners
  • Hot Gas Generators
  • raw material and fuel drying systems
  • boilers and power generation systems
The number of WARP gasification modules is determined by the required energy capacity and
available feedstock volume. Where appropriate, the configuration can allow for subsequent
capacity expansion.

The integration concept is developed for each cement plant based on the kiln line, available space, existing fuel infrastructure and operating requirements.

Project Delivery Models

  • Equipment Supply and Integration
    Under this model, the cement plant acquires the WARP system for integration into its existing energy infrastructure.

    Univastum’s scope can include project configuration, engineering, supply of process equipment, integration, commissioning and an agreed scope of long-term technical support.
  • Energy-as-a-Service
    Under the Energy-as-a-Service model, the waste-to-energy infrastructure is developed and operated by Univastum, with syngas, thermal energy and/or electricity supplied to the cement plant under a long-term agreement.

    Depending on the project structure, Univastum may also arrange financing for the required capital investment. Energy supply parameters, allocation of responsibilities, pricing structure and contract term are defined for each project individually.
Preliminary Project Assessment
An initial assessment typically requires basic information about the cement plant:
  • Kiln line
    clinker production capacity, kiln type, preheater and calciner configuration.
  • Fuel balance
    natural gas, coal, petcoke and other fuels currently used, consumption volumes and costs.
  • Alternative fuels
    existing thermal substitution rate and characteristics of RDF/SRF and other alternative fuels currently used.
  • Available feedstock
    RDF/SRF, municipal and industrial waste, biomass and other potential waste-derived fuel streams.
  • HGG and drying systems
    existing equipment, thermal capacity and fuel consumption.
  • Infrastructure
    available space, utilities and potential syngas integration points.
Based on this information, a preliminary WARP gasification modular configuration can be
defined, including potential integration points, required thermal capacity, feedstock demand, the
potential range of conventional fuel substitution and preliminary project economics.

The next stage typically includes development of the material and energy balance, integration concept and techno-economic assessment.