Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Positive Technical Due Diligence for a Proposed Cyprus Project

4 May 2022
Univastum’s proposed waste gasification solution has received a positive assessment following independent technical due diligence by EnergyIntel Services Ltd in Cyprus. The bank-appointed engineering consultancy evaluated the solution for a potential waste-to-energy project.
The study examined the proposed technology, engineering design, operating data and suitability for deployment in Cyprus. Its scope also covered environmental considerations, permitting requirements and project implementation risks.

Positive findings on technical feasibility and engineering capability
EnergyIntel concluded that the proposed gasification application represents a technically feasible waste treatment process. Based on the data reviewed, the report found that the process can treat a range of waste feedstocks, including refuse-derived fuel (RDF) and solid recovered fuel (SRF), to produce syngas for subsequent electricity generation.
The assessment highlighted the simplified process design, the selection of equipment from established manufacturers and the provision of backup equipment in key process stages. It also recognised Univastum’s technical know-how and engineering experience as important factors supporting project implementation.
The assessment also drew on operating data from the core gasifier, which had previously operated periodically as a standalone unit.

Next steps for project development
Alongside its positive technical feasibility findings, EnergyIntel outlined recommendations to guide the project owner and engineering teams through the next stages of development in Cyprus. These cover further engineering work, local permitting, environmental requirements and grid connection arrangements. The report also recommended engaging local engineering partners to support coordination with the relevant authorities and implementation of country-specific requirements.
For Univastum, the assessment provides independent technical support for further development of the proposed project and a defined set of priorities for adapting the solution to local requirements.