Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

WARP Configuration Optimised for Industrial Natural Gas Substitution

04 April 2025
Univastum has completed the optimization of its WARP gasification configuration for partial or full substitution of natural gas with waste-derived syngas in industrial thermal applications. The development extends the company's modular energy platform to manufacturers seeking greater fuel flexibility and more predictable operating costs.

The work responds to growing concerns among industrial customers about natural gas price volatility. For cement producers, food processors and other energy-intensive manufacturers, unstable fuel prices can complicate production planning and investment decisions. Reducing dependence on a single energy market has therefore become an important consideration alongside emissions reduction.

The updated WARP gasification configuration produces combustible syngas from qualified prepared fuels, including MSW-derived fractions, RDF, SRF, biomass and selected industrial residues. Unlike systems focused on electricity or direct heat production, it provides a gaseous fuel for compatible boilers, furnaces, burners and hot gas generators. Syngas production is designed for continuous operation, independently of weather conditions or daylight hours.

One standard WARP gasification module processes approximately 5 tonnes of prepared fuel per hour and can provide an indicative 15–23 MWth of syngas chemical energy. This corresponds to the energy content of approximately 1,500–2,300 Nm³ of natural gas per hour, assuming 36 MJ/Nm³. For existing equipment, 20–30% thermal substitution can be evaluated initially; higher levels require project-specific combustion-system assessment and, where necessary, modification.

The updated configuration also includes gas preparation and integration options for industrial users, including options to retain natural gas as backup and combine several modules at larger facilities. By linking continuous fuel-gas production with locally available waste streams, the approach aims to improve energy-cost visibility while making productive use of combustible materials that would otherwise require disposal.

This development expands the industrial applications of WARP gasification technology, allowing manufacturers to reduce their dependence on natural gas while retaining compatible existing thermal equipment and developing more predictable alternative fuel supply arrangements.