Irish company Univastum and Belgian company Ecopia have signed a Letter of Intent (LOI) for the development of a waste-to-energy project in Ostend, Belgium.
The project involves integrating Univastum’s proprietary WARP gasification technology into an environmental technology park being developed by Ecopia. Univastum will serve as the project’s technology partner, responsible for the waste gasification system and the production of synthesis gas for subsequent electricity generation.
The project will feature one standard WARP gasification module with a nominal processing capacity of 5 tonnes of prepared waste per hour. The facility is expected to process approximately 35,000–40,000 tonnes of waste annually, including plastic waste and refuse-derived fuel (RDF).
The synthesis gas produced through the gasification process will be used to generate electricity, primarily to meet the energy needs of the environmental technology park.
Under the cooperation framework, Ecopia will be responsible for developing the environmental technology park, preparing the site, securing feedstock supplies, obtaining the necessary permits and regulatory approvals, and developing the supporting infrastructure required to integrate the WARP gasification system.
The project is currently at the preliminary engineering (pre-FEED) stage, focusing on the technical configuration, integration of process systems, and supporting infrastructure. Project implementation is scheduled to begin in 2027.
The cooperation between Univastum and Ecopia aims to advance the deployment of waste-to-energy technologies and support the development of sustainable industrial energy infrastructure in Belgium.