Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Univastum and Ecopia Sign LOI for Waste-to-Energy Project in Belgium

20 May 2026
Irish company Univastum and Belgian company Ecopia have signed a Letter of Intent (LOI) for the development of a waste-to-energy project in Ostend, Belgium.

The project involves integrating Univastum’s proprietary WARP gasification technology into an environmental technology park being developed by Ecopia. Univastum will serve as the project’s technology partner, responsible for the waste gasification system and the production of synthesis gas for subsequent electricity generation.

The project will feature one standard WARP gasification module with a nominal processing capacity of 5 tonnes of prepared waste per hour. The facility is expected to process approximately 35,000–40,000 tonnes of waste annually, including plastic waste and refuse-derived fuel (RDF).

The synthesis gas produced through the gasification process will be used to generate electricity, primarily to meet the energy needs of the environmental technology park.

Under the cooperation framework, Ecopia will be responsible for developing the environmental technology park, preparing the site, securing feedstock supplies, obtaining the necessary permits and regulatory approvals, and developing the supporting infrastructure required to integrate the WARP gasification system.

The project is currently at the preliminary engineering (pre-FEED) stage, focusing on the technical configuration, integration of process systems, and supporting infrastructure. Project implementation is scheduled to begin in 2027.

The cooperation between Univastum and Ecopia aims to advance the deployment of waste-to-energy technologies and support the development of sustainable industrial energy infrastructure in Belgium.

About Univastum

Univastum is an Irish Waste-to-Energy platform specialising in the development and delivery of waste-to-energy projects based on its proprietary modular WARP gasification technology.

A standard WARP gasification module, with a processing capacity of 5 tonnes of prepared waste per hour, can support net electricity generation of approximately 5.5–8 MW, depending on feedstock characteristics and system configuration. The technology can also be used to produce industrial steam, cooling, or synthesis gas as a substitute for natural gas.

Univastum offers both technology and equipment supply and comprehensive turnkey project delivery, including engineering, construction management, and financing arrangements. The company also develops projects under an Energy-as-a-Service (EaaS) model, enabling industrial customers to access energy products without direct capital investment in the technology infrastructure.

About Ecopia

Ecopia is a Belgian company developing an environmental technology park in Ostend, integrating waste processing and energy generation technologies.

The project is led by Luc Desender, who has extensive experience in the development and implementation of waste-to-energy projects, wind farms, and other environmental and renewable energy infrastructure projects.