Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Fertilizer Plants

Process Steam, Drying Heat and Electricity from Waste
and Alternative Fuels
Univastum develops WARP-based energy systems for fertilizer plants, converting prepared waste and alternative fuels into process steam, drying heat and electricity.

Mineral fertilizer production includes several technologically distinct segments with different energy requirements: phosphoric acid and phosphate fertilizers, NPK/NP/PK fertilizers, ammonia and nitrogen fertilizers, as well as potash and specialty fertilizers.

These systems can produce process steam, hot gas for drying, process heat and electricity from prepared waste and alternative fuels.

Potential feedstocks include RDF/SRF, prepared municipal solid waste (MSW), industrial waste, biomass, agricultural residues, waste wood, non-recyclable plastics, end-of-life tyres (ELT) and other suitable combustible feedstocks.

The optimum configuration is determined by the actual site energy balance: steam demand at different pressure levels, natural gas consumption, drying loads, electricity demand, internal steam generation and available fuel sources.
For most brownfield fertilizer plants, the preferred first integration point is the existing utility infrastructure rather than the core chemical process.
Univastum develops dedicated Waste-to-Steam and Waste-to-Energy utility systems that can be integrated into existing production infrastructure with limited interference in the main fertilizer process.

Three Energy Products.
One Technology Platform.

WARP gasification downstream can be configured around the actual energy requirements of the fertilizer plant.
  • Process Steam

    Waste-derived syngas can be converted into process steam for evaporation, concentration, heating, granulation and other steam consumers.
  • Drying Heat

    Syngas can supply a dedicated Hot Gas Generator (HGG) or suitable burner system, reducing natural gas consumption in fertilizer and raw-material drying.
  • Electricity

    WARP gasification downstream can be configured for electricity generation or integrated into a combined steam, heat and power system.
The objective is not to maximise energy production in one form.
It is to match the modular WARP downstream configuration to the actual energy balance of the
plant.

Standard WARP Gasification Module — Indicative Design Basis

For preliminary project screening, one standard WARP gasification module can be considered on
the following basis:
At approximately 8,000 operating hours per year, the syngas energy produced by one module corresponds to roughly 12–18 million Nm³/year of natural gas on an energy-equivalent basis.

Actual displacement depends on feedstock LHV, syngas composition, natural-gas calorific value and the efficiency of the specific thermal consumer.

WARP operates on prepared fuel. Where incoming MSW is used, the project includes sorting, removal of recyclable and inert fractions, shredding, drying and fuel preparation.

Note: The figures of approximately 80,000 t/year of incoming MSW and 40,000 t/year of prepared fuel represent different stages of the same fuel-preparation chain and are not additive.

Final performance is defined during Pre-FEED / FEED against the agreed Feedstock Specification.

Potential Benefits for Fertilizer Producers

  • Process steam
    from alternative fuels
    steam production from MSW-derived fuel, RDF/SRF, industrial waste, ELT, biomass and other suitable fuels.
  • Reduced natural gas consumption
    partial substitution of natural gas in boilers, dryers and other thermal consumers.
  • Energy
    cost control
    reduced exposure to volatility in natural gas and electricity prices.
  • Fuel
    diversification
    use of multiple local and regional fuel sources, reducing dependence on a single energy resource.
  • On-site
    energy production
    steam, heat and electricity produced directly at the fertilizer or chemical complex.
  • Potential reduction
    in fossil CO₂ emissions
    where fossil fuels are displaced by suitable waste-derived or biogenic energy sources.
  • Modular
    expansion
    capacity can be increased by adding WARP modules as energy demand or available fuel supply grows.

Fertilizer Production Routes and Energy Requirements

The most appropriate WARP configuration depends on the fertilizer production route, the existing utility system and the site’s actual energy balance.

Phosphoric Acid and Phosphate / NPK Fertilizers

For facilities producing phosphoric acid, monoammonium phosphate (MAP), diammonium phosphate (DAP), NP, NPK and other phosphate fertilizers, process steam and drying heat are typically the most relevant WARP energy products.

Steam can be used for:
  • phosphoric acid concentration
  • evaporation
  • process-media heating
  • raw-material preparation
  • granulation
  • auxiliary process systems
Drying of granulated fertilizers and raw materials can create an additional significant thermal load.
A typical integrated configuration may be:
MSW / RDF / SRF / Industrial waste / ELT / biomass → Preparation → WARP → Syngas → Steam generation + HGG / drying + optional power
Some process units, particularly sulphuric acid plants, can themselves generate substantial quantities of steam.

A WARP gasification project should therefore be sized against the overall site steam balance and
net steam deficit, rather than simply the nominal demand of individual process units.

Nitrogen Fertilizers

Ammonia, nitric acid, urea, ammonium nitrate, calcium ammonium nitrate (CAN) and urea ammonium nitrate (UAN) production have a fundamentally different energy profile.

In ammonia production, natural gas is commonly used both as an energy source and as a chemical feedstock for hydrogen production. Replacing utility steam therefore addresses only part of the total fossil-energy demand and carbon footprint.

For existing nitrogen-fertilizer sites, the initial WARP integration is typically focused on:
  • auxiliary steam
  • selected thermal consumers
  • electricity generation
  • auxiliary utilities
  • energy recovery from local or regional waste
A deeper integration pathway is:
Waste-derived syngas → Hydrogen → Ammonia
This pathway is technically possible but requires deep gas cleaning, water-gas shift conversion, CO₂ removal, hydrogen purification, compression and integration with the ammonia synthesis loop.

It should therefore be considered a future integration option rather than the base case for an initial
WARP gasification project.

Potash and Specialty Fertilizers

Potash, crystalline and water-soluble fertilizer production may require significant energy for:
  • evaporation
  • crystallisation
  • drying
  • heating
  • process-water preparation
  • electrical equipment
Depending on the production process and site energy balance, Waste-to-Steam, direct process heat and electricity can be supplied individually or through an integrated energy system.

Waste-to-Steam for Fertilizer Production

For fertilizer plants with stable thermal demand, WARP gasification downstream can be configured
primarily as a Waste-to-Steam solution.

A typical energy chain is:
MSW / RDF / SRF / Industrial waste / ELT / biomass → Preparation → WARP gasification → Syngas → Boiler → Process steam
For one module operating on approximately 5 t/h of prepared RDF/SRF with an LHV of 14–22 MJ/kg, indicative steam production is approximately:
20–31 t/h of process steam
For prepared MSW-derived fuel with an LHV of approximately 12–18 MJ/kg, the indicative range is approximately:
17–25 t/h of process steam
Two WARP modules may therefore represent an initial screening case of approximately:
35–60 t/h of steam
(depending on fuel quality and system configuration).
A fertilizer complex with a stable steam deficit of approximately 40–60 t/h may, as an initial screening case, correspond to a two-module WARP Waste-to-Steam configuration.

These figures are preliminary engineering values rather than performance guarantees.

Syngas and Hot Gas for Fertilizer Drying

At NPK, NP, phosphate and specialty-fertilizer facilities, drying can represent a significant natural-gas load.

Waste-derived syngas can be supplied to a dedicated Hot Gas Generator:
Waste / RDF / SRF / ELT / biomass → WARP → Syngas → HGG → Hot gas → Dryer
Alternatively:
WARP → Conditioned syngas → Dual-fuel burner → Drying system
For brownfield fertilizer plants, HGG or burner integration can reduce natural gas consumption without direct intervention in the core chemical process.
The existing conventional-fuel system can remain available for start-up, peak demand and backup.

For standalone NPK production, HGG / dryer integration may represent the simplest first WARP® application, providing a direct route to reducing fossil-fuel consumption within the existing production infrastructure.

Integrated Steam, Heat and Power

Large fertilizer and chemical complexes typically have several simultaneous energy demands rather than a single utility requirement.

A WARP installation can therefore be configured as an integrated industrial energy platform:
WARP gasification modules → common syngas header → steam boiler + HGG / dryers + CHP
Energy can be distributed between:
  • process steam
  • drying heat
  • other process heat
  • electricity generation
Where direct thermal or steam demand is available, these applications should normally be evaluated before electricity generation alone, as they may provide higher overall utilisation of the available fuel energy.
For electricity-oriented applications, one standard module can provide approximately 5.5–8 MWe net, depending on fuel LHV, power-island configuration and plant auxiliary consumption.

Multiple WARP gasification modules can feed a common syngas system. An individual module can
be isolated for maintenance while the remaining modules continue operating at available capacity.

Existing boilers, conventional-fuel burners and grid connections can remain in service for peak loads, start-up and redundancy.

Waste and Alternative Fuel Sources

A WARP gasification project can be developed around one primary fuel source or a controlled combination of suitable feedstocks.

Potential feedstocks include:
  • prepared MSW
  • RDF and SRF
  • suitable industrial waste
  • non-recyclable mixed plastics
  • end-of-life tyres and tyre-derived fuel
  • woody biomass and waste wood
  • agricultural residues
  • controlled blends of suitable fuels
The fertilizer producer does not need to generate the entire fuel requirement on-site.

A project may combine:
On-site industrial waste + MSW-derived fuel + external RDF/SRF + Biomass + ELT
The objective is not to maximise the number of acceptable feedstocks. It is to establish a stable fuel mix that can be secured under long-term supply arrangements, with predictable calorific value, contaminant limits, availability and delivered cost.

Feedstock qualification includes LHV, moisture, ash, chlorine, sulphur, alkalis, metals, particle size, bulk properties and composition stability.

Materials suitable for recycling should be directed to appropriate material-recycling routes.

Integration into Existing Fertilizer Production

For most brownfield fertilizer plants, the lowest-risk initial approach is to integrate WARP gasification
solutions into the existing utility infrastructure.

Typical connection points include:
  • steam headers
  • boiler house
  • Hot Gas Generators
  • fertilizer dryers
  • auxiliary thermal consumers
  • electrical distribution
  • CHP infrastructure
A practical development path is:
PHASE 1
Waste-to-Steam or HGG / Drying
PHASE 2
Additional Steam Headers and Thermal Consumers
PHASE 3
CHP / Integrated Syngas Distribution
PHASE 4
Deeper Chemical Integration Where Technically and Economically Justified
This staged approach allows operating data to be accumulated before WARP based solution is
integrated more deeply into the production site.
For existing fertilizer plants, the first objective is therefore not to redesign the production process around WARP gasification, but to integrate WARP gasification around the site’s existing energy demand.

Potential Reduction in Fossil-Fuel Use and CO₂ Emissions

Mineral fertilizer production is energy-intensive, but its carbon profile differs significantly between production routes.

For phosphate/NPK and specialty-fertilizer plants, production-related emissions may be associated with fossil fuels and purchased electricity used for steam generation, drying, process heating and auxiliary utilities.

Replacing natural gas or another fossil fuel with WARP energy can therefore reduce fossil-energy consumption.

For ammonia and nitrogen fertilizers, a significant share of the production footprint is associated with hydrogen and ammonia production. Waste-to-Steam can reduce the utility component, but it does not replace the need to address the carbon intensity of ammonia feedstock.

Project-specific CO₂ calculations should consider:
  • displaced fossil fuel
  • fuel LHV
  • fossil/biogenic fraction of the alternative fuel
  • conversion efficiency
  • auxiliary electricity
  • transportation and fuel preparation
  • actual plant utilisation
The CO₂ benefit is project-specific and depends on the displaced fossil fuel, feedstock composition, conversion efficiency and plant utilisation. Waste-derived energy is therefore assessed on its actual fossil/biogenic carbon balance rather than assumed to be low-carbon by default.

Fertilizer Carbon Footprint and CBAM

Carbon intensity is becoming an increasingly important commercial characteristic of mineral fertilizers.

For producers supplying the European Union, the Carbon Border Adjustment Mechanism (CBAM) creates an additional link between production emissions and market competitiveness for covered fertilizer products.
Reducing natural gas consumption, fossil-based steam generation and grid electricity demand may therefore affect:
  • operating costs
  • direct emissions
  • product carbon footprint
  • CBAM exposure
  • Scope 1 / Scope 2 reporting
The actual impact is evaluated for each project based on the applicable methodology, fertilizer production route and site-specific energy balance.

Cooperation Models

Univastum can deliver projects through two principal commercial models: equipment and system supply, or long-term energy supply.
  • Supply and Integration of the Energy System
    Under this model, the fertilizer producer owns the energy system.

    Univastum performs the agreed engineering scope, supplies the WARP® system and associated energy island, and integrates the solution into the plant’s steam, thermal and electrical infrastructure.

    The final project scope is defined around the required energy products, feedstock specification, existing plant infrastructure and agreed battery limits.
  • Energy-as-a-Service / Steam-as-a-Service
    For fertilizer production, long-term steam supply can be particularly attractive.

    The commercial delivery point can be defined directly in terms of the required energy product:

    X t/h of steam at Y barg and Z°C at the customer’s battery limit.

    Univastum or the project company can provide fuel preparation, gasification, steam generation, O&M and agreed availability, while the customer purchases the agreed volume of energy under a long-term contract.

    The same model can be applied to electricity or combined steam-and-power supply.
The commercial structure is therefore built around the energy required by the fertilizer plant rather than ownership of the WARP equipment itself.
How a Project Starts
We Start with the Plant’s Actual Energy Balance. A preliminary assessment requires information in the following areas:
  • Production
    Fertilizer types and annual production volumes.
  • Steam
    Pressure levels, temperature, minimum, average and peak demand.
  • Steam Generation
    Boilers, CHP, waste-heat boilers and internal steam producers.
  • Condensate
    Return rate and temperature.
  • Natural Gas and Other Fuels
    Consumption, cost and principal consumers.
  • Drying
    HGG systems, dryers, gas consumption and required temperatures.
  • Electricity
    Base load, peak load and tariffs.
  • Waste / Fuels
    MSW, RDF/SRF, industrial waste, ELT and biomass: quantities, composition, moisture and
    LHV.
  • Site
    Available area, utility connection points, grid access and logistics.
  • CO₂
    Reporting boundaries, carbon targets and CBAM exposure.

Preliminary Technical and Economic Assessment

Based on the available information, Univastum defines:

  • the most suitable integration point
  • net steam deficit
  • required steam pressure
  • number of WARP® modules
  • prepared-fuel requirement
  • expected steam production
  • HGG / dryer integration potential
  • electricity / CHP potential
  • reduction in natural gas consumption
  • indicative fossil CO₂ effect
  • preliminary CAPEX / OPEX
  • preliminary energy cost
  • the most appropriate commercial model
Complete data are not required at the initial stage.
Additional information can be identified as the Pre-FEED assessment progresses.