Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Waste-to-Energy for Pharmaceutical Manufacturing

Industrial Steam, Electricity, Process Heat and Cooling from Prepared Waste-Derived Fuels.
Univastum develops modular Waste-to-Energy solutions based on its proprietary WARP gasification technology for pharmaceutical manufacturing facilities. Depending on the configuration, these systems provide industrial steam, electricity, process heat and cooling, enabling the partial replacement of conventional energy sources.

For pharmaceutical sites, the energy facility is typically designed as a separate Energy Island, integrated with the site's existing utility infrastructure. Prepared fuel can be sourced externally, while the pharmaceutical manufacturer's qualified utility and production systems remain under its control.

Energy Solutions for Pharmaceutical Manufacturing

Univastum's solutions can be applied to active pharmaceutical ingredient (API) manufacturing, biotechnology and sterile pharmaceutical production, as well as large multi-building pharmaceutical campuses.

Project suitability depends primarily on sustained energy demand, operating hours, fuel availability and the potential for integration with existing infrastructure.

Examples of WARP Applications in Pharmaceutical Manufacturing

The configuration is determined by the site's actual energy demand profile, manufacturing scale, operating hours and project economics. For multi-building pharmaceutical campuses, a central energy facility serving several production units may be considered.

Industrial Steam

For pharmaceutical facilities with substantial and sustained steam demand, connection to the existing plant-steam network is one of the main integration options.
Prepared Fuel → WARP gasification→ Syngas → Steam Boiler → Plant Steam Network
Industrial steam can be used for indirect heating of reactors and process equipment, distillation, evaporation, solvent recovery, drying and hot-water generation.

Steam capacity and supply conditions, including pressure and temperature, are determined by the site's base-load requirements and individual process needs.

Electricity, Heat & Cooling

A power generation configuration can supply electricity to manufacturing equipment, pumps, compressors, chillers and heating, ventilation and air-conditioning (HVAC) systems.

The indicative electrical capacity of a power generation facility based on one standard WARP module is 5.5–8 MW, depending on fuel characteristics and the configuration of the generation equipment.
Where both heat and electricity are required, combined heat and power (CHP) may be considered. The balance between energy products is determined by the project's overall mass and energy balance.

Cooling can be provided through electric chillers or, where technically and economically appropriate, absorption chillers using steam or recovered heat.

Dedicated Energy Island & GMP Integration

For pharmaceutical facilities, Univastum offers a dedicated Energy Island, physically separated from pharmaceutical production areas and integrated with existing utility infrastructure to supply industrial steam, electricity, heat and cooling.

Plant steam can provide heat for clean-steam generation within the site's existing qualified systems. Clean-steam systems, water for injection (WFI) and other GMP-regulated utilities remain under the pharmaceutical manufacturer's control. Integration is subject to the manufacturer's Good Manufacturing Practice (GMP) change-control procedures, including assessment of any impact on qualified utilities and validated systems.

Utility Reliability & Redundancy

WARP gasification is designed to supply the pharmaceutical facility's base-load energy requirements. Existing boilers, grid connections and backup energy sources may be retained to meet peak demand, provide backup during planned maintenance and maintain continuity of energy supply.

The required backup capacity, conditions for switching between energy sources and continuity-of-supply requirements are defined during project engineering. A multi-module configuration can be designed to continue operating at reduced capacity when an individual module is taken offline for maintenance, subject to the design of shared systems.

Fuel Supply

The WARP energy facility can use prepared fuel derived from municipal solid waste (MSW), RDF, SRF, suitable biomass and non-hazardous industrial waste streams that meet project-specific technical and regulatory requirements.

Fuel supply can be arranged through external providers under long-term agreements. During project development, Univastum assesses fuel availability, quality, cost, preparation requirements and logistics to support reliable operation of the energy facility.

Project Delivery Models

Univastum offers two project delivery models: equipment supply and integration into the pharmaceutical facility's existing infrastructure, or Energy-as-a-Service — the long-term supply of industrial steam, electricity, heat or cooling without the customer having to purchase its own energy generation facility.

Under Energy-as-a-Service, financing, construction, operations and maintenance may be undertaken by Univastum or a dedicated project company, subject to the contractual arrangements.

How a Project Starts

A preliminary assessment begins with an evaluation of the pharmaceutical facility's actual energy requirements and existing utility infrastructure.
Based on the available information, Univastum assesses the potential configuration, integration requirements, scale of the energy facility, redundancy requirements and preliminary project economics.