Warp Gasification
team@univastum.com
Knowledge Base
Chief Technology Officer
Peter Kalenuk
Industrial Waste-to-Steam
Integrated Waste-to-Steam facility for industrial client
Spain
Municipal Waste-to-Electricity
Modular Waste-to-Energy facility for municipal solid waste
Romania
investors@univastum.com
Chief Investment Officer
Eben Klynsmith
Our Approach
Work With Us
Insights & News
Press Kit
mt@univastum.com
Chief Marketing & Communications Officer
Matthew Tucker

Our Approach to Sustainable Waste-to-Energy

Sustainability built into every project
At Univastum, sustainability is not treated as a separate feature or a statement of intent. It is built into the way we assess, design and develop every project.

Our approach begins with local conditions: the available waste streams, existing infrastructure, environmental requirements and the energy needs of the community or industrial user.

We use this information to develop an integrated waste-to-energy configuration that combines material recovery, fuel preparation, controlled drying, waste gasification and the production of electricity, industrial steam or process heat.

Starting with waste. Designed around energy demand.

Every project starts with a detailed understanding of the incoming waste. Depending on the application, this may include mixed municipal solid waste (MSW), commercial waste, industrial waste, prepared refuse-derived fuel (RDF) or solid recovered fuel (SRF).

We assess:
  • Waste composition and available volumes
  • Moisture content and calorific value
  • Seasonal and operational variation
  • Non-combustible and unsuitable materials
  • Preparation and storage requirements
  • Long-term security of the waste supply
The energy configuration is developed in parallel. We assess whether the project should produce electricity, industrial steam, process heat or combined heat and power, based on verified local demand and the infrastructure available at the site.

This allows the waste-processing system and energy plant to be designed as one integrated project.

An integrated system

Waste preparation is a central part of the Univastum approach.

Metals, glass, stones and other non-combustible materials are removed from the incoming waste. The remaining combustible fraction may include plastics, paper, cardboard, textiles, wood and other suitable materials.

This fraction is processed into a consistent fuel and dried to the moisture level required by the gasification system. The prepared fuel is then converted into thermal energy, which can be used to produce electricity, steam or process heat.

Mineral residues remaining after conversion are assessed for further treatment and potential use in construction products, subject to their characteristics, applicable standards and local certification requirements.

Modular and project-specific

Our modular approach allows plant capacity to be aligned with verified waste volumes and local energy requirements. Additional modules can be incorporated where waste availability and energy demand support expansion.
Each installation is engineered around project-specific data rather than a fixed universal configuration.

Plant design and operating parameters take into account:
  • Feedstock characteristics
  • Required energy output
  • Site and infrastructure conditions
  • Environmental and permitting requirements
  • Grid or industrial connections
  • Operational and maintenance needs
  • Opportunities for future expansion
The objective is to develop a configuration that is technically reliable, environmentally responsible and commercially workable.

Evidence-based development

A project progresses as the quality and certainty of the available information improve.
Initial assessments are followed by waste analysis, mass and energy balances, technology configuration, site studies, environmental review and commercial evaluation. Where required, these activities are developed further through feasibility studies, pre-FEED and detailed engineering.
We distinguish clearly between preliminary estimates, engineering assumptions and verified performance data. Key decisions are based on the level of evidence appropriate to the relevant stage of project development.

Measurable performance

We assess project sustainability through measurable outcomes. Depending on the project, these may include:
  • Waste diverted from landfill
  • Metals and suitable inorganic materials recovered
  • Electricity, steam or process heat produced
  • Conventional fuel consumption displace
  • Potential greenhouse-gas emissions avoided
  • Mineral residues converted into useful products
  • Compliance with applicable emissions requirements
Environmental benefits are evaluated on a project-specific basis using engineering studies, emissions modelling and, where appropriate, life-cycle assessment.

Responsibility throughout the project lifecycle

A sustainable project must remain reliable beyond construction. We therefore consider the complete project lifecycle—from initial assessment and engineering through procurement, construction, commissioning, operation, maintenance and performance monitoring.
Clear responsibilities, reliable operating arrangements and long-term technical support are essential to protecting the interests of clients, communities, investors and project partners.
Our objective is to develop integrated waste and energy infrastructure that creates lasting value by recovering materials, producing useful energy and working towards the elimination of routine landfill disposal.